OpenRail Overhead Line Designer Help

Mast List

Ribbon: Home > Reporting

When creating the mast list, Sicat Master dumps all necessary information into a text file, which is loaded by an Excel-macro after the confirmation of the arranger and refined to the DB-compliant layout.

For this purpose, the arranger:
  • Selects either all or none of the masts and fixings at the structures to the released
  • Pushes the button for the mast list
  • Chooses whether Excel should be started
  • Activates all the macros when Excel automatically starts up